Stud wall completed.

In early February we finished the stud wall that was required to line the angled wall as it was difficult to run the top hat with just the portal frames and then against the door frame. So that flimsy Rondo stud framing was installed and the Villaboard and Termiflor does end up giving it some rigidness.


The wall was sealed as per the rest of the walls and joins.


For some reason, I don' t have a photo of the wall partially built, but you can see the stud framing on the far left of this image.