Due to a slight oversight, as the conduits were installed some years prior to the shed actually being built we had a small problem as the conduits were only 32 mm. And running 16mm2 three phase from the house to the shed presented and issue as that cable is not allows in 32 mm conduit as per the good book.
So, to overcome this it involved splitting the orange circular and running the three phases, neutral and earth across two 32 mm conduits and running in a fibre optic for connectivity as data cabling cannot be mixed with power circuits, but fibre can!
The orange circular 16 mm2 exits the house and is split across the two conduits to the shed with the fibre optic as well.
The inside of the shed where the switchboard will end up eventually. Spoiler alert, as I am so far behind here it is already completed! Hahaha.
Okay, sealing the floor should be next...