Wednesday, July 12, 2023

Time to pull the finger out!

With twelve brand new Auscision C class units arriving during the week, and a further two still in transit I really need to get a wriggle on and get this train room up and barking.
The C class has been coming since 2018, I ordered my first batch of eight units back in January 2018. Then ordered a further four in January 2021. And the final unit in July 2022.
I have also ordered the unannounced C 510 in VR livery, model number C-24, following them being put up on the website.
All are DCC with sound. The preordered units were $395 each and the unannounced unit was $465.


These fourteen units will supplement the two Broad Gauge Models all brass C class units, one in V/Line and one in VR liveries. These brass build units date from 1988 and were sold for $595 each back in those days.

So, I have started prepping the inside of the shed for the lining to be done. Sealing the slab to the air cell to reduce the ingress of dust, water and crawlies. And taping the air cell joins. Once this is done then the internal lining and insulation can be undertaken.

Sunday, July 2, 2023

Shed builder says shed is complete!

Well... the builder says he is finished. It looks ok, just a few minor things as usual and I need to start the sealing of the slab to the walls and the outside eave to the wall cladding on the low side of the roof.

View from entry looking towards the north end.
Shed is a custom build size which is 14 metres long by 7.5 metres wide with an angle section at one end with a skillion roof. Ceiling height will be just over 2.1, which was an oversight by the builder by setting the overall height too low on one post...layout space is the full width, once lined, and 10 or 11 metres long.

View from the north end looking south towards the entry.
This leaves three metres for storage and shed space while the carport gets looked into.
The double door is a Latham's steel double door with two leaves, each a metre wide.


Now the real fun stuff is about to start...

Tuesday, June 27, 2023

Four walls and a roof...

Blink and you'd miss it...
After the painting of the portal frames was completed over the other weekend, in a day the roof was on, and the entry door installed.


And then two days later the walls were stood, but they still have several hundred screws to install.
But it is getting close.


Onwards to final completion!